Steel sheet with factory-fired glass (glass-fused-to-steel)

Glass-Fused-to-Steel (GFS) Sectional Water Tank

Glass-fused-to-steel (GFS) sectional water tank: factory-fused glass coating on bolted panels for municipal, wastewater, biogas and industrial storage.

Capacity Project-specific; small sectional units to multi-thousand m³ site-assembled tanks Applications Municipal potable water, wastewater, effluent, industrial process water
Request a Quotation
Glass-fused-to-steel sectional water tank with cream glass-coated panels, bolted modular construction
Glass-Fused-to-Steel (GFS) Sectional Water Tank — factory photo for illustration of construction; final configuration per approved drawing.

Glass-fused-to-steel (GFS) bolted sectional water tanks combine the mechanical strength of a steel panel with a factory-fired glass coating on both faces. The coating is applied as a glass slurry, dried and fired at high temperature so that it fuses to the steel surface. The result is a hard, inert barrier that is resistant to many waters and wastewaters, and that does not depend on a site-applied paint film for its performance. Panels are bolted together on site with sealed joints, so the tank can be shipped flat-packed and assembled without welding.

GFS is one of LONGCOM’s five tank families, alongside bolted stainless, welded stainless, hot-dip galvanized (HDG) and BDF duplex-coated panels. It is normally selected for municipal potable water, wastewater and effluent storage, biogas-adjacent duties, large industrial volumes and projects that need a long coating life with a lower panel cost than stainless. It is not a universal material: the glass layer can chip if panels are handled badly, and its chemical resistance must be checked against the actual water, cleaning regime and temperature. This page explains where GFS fits, what the panel build-up should include, and what to verify before a quotation.

Naming note. In international tender documents the product is usually called glass-fused-to-steel (GFS), glass-coated steel or vitreous-enamel steel. Older Chinese trade literature may call it an “enamel steel tank” (搪瓷钢板水箱). These names describe the same family, but the specification is not the same across suppliers. Compare the panel build-up, coating thickness, firing process, test records and repair method — not the label alone.

What “glass-fused-to-steel” actually means

A GFS panel starts as a steel sheet. The sheet is cut, punched and formed into the panel shape. The glass coating is then applied to both faces and fired in a furnace. At the firing temperature, the glass softens and wets the steel surface, forming a mechanical and chemical bond. The finished panel has a glass surface that is hard, smooth and electrically insulating, with a colour that is part of the coating rather than a separate paint layer.

This is different from a factory-applied epoxy coating or a site-painted panel. An epoxy film is a polymer barrier that depends on surface preparation and adhesion; it can be repaired more easily, but it is also softer and more permeable. A glass coating is harder and more inert, but it is brittle. A chip exposes the steel substrate, and the exposed area must be repaired with the approved kit. The handling and installation method therefore matters as much as the coating specification.

The panel is not “glass-lined” in the chemical-process sense of a thick glass lining on a pressure vessel. It is a thin, factory-fired coating on a structural steel panel. The steel carries the load; the glass protects the surface. The design must respect both: the panel thickness and tie-rod system for the water load, and the coating thickness and handling rules for the barrier.

Where GFS tanks fit best

Application Why GFS fits What to confirm before quoting
Municipal potable water Inert glass surface, smooth interior, good cleanability and a long coating life; modular panels suit large volumes. Local potable-contact approval, coating system datasheet, colour, cleaning procedure and sampling access.
Wastewater and effluent Glass coating resists many sewage and effluent environments better than a thin paint film; panels can be replaced locally. pH, chloride, sulphide, temperature, abrasion and the presence of fats, oils, grease or solvents.
Biogas-adjacent storage Corrosion-resistant envelope for digestate, slurry or process water where the chemistry is compatible. Sulphide, ammonia, organic acids, temperature and any gas-phase exposure at the headspace.
Large industrial volumes Lower panel cost than stainless at large diameters; factory coating; flat-packed export. Chemistry, design life, structural loads, inspection access and the repair plan.
Fire water and irrigation Long-life coating and modular construction for large reserves and remote sites. Fire code, usable volume, refill rate, outlet arrangement and whether potable approval is required.
Aggressive chemical duty Selected only after a chemical compatibility review; glass is not resistant to every acid or alkali. Full water analysis, cleaning chemicals, temperature, concentration and exposure time. Hydrofluoric acid and hot strong alkali are particular concerns.

GFS is often the right answer when the project wants a longer coating life than HDG, a lower cost than stainless, and a surface that can be cleaned. It is the wrong answer when the water contains hydrofluoric acid, when the pH is outside the coating supplier’s stated range, when the temperature is above the coating’s limit, or when the site cannot handle panels without chipping them. In those cases, the cheap panel price is irrelevant if the coating fails in the first years.

Panel and coating specification

The quotation should describe the panel as a build-up. The table below lists the items that should be fixed in writing; the values are typical ranges for discussion, and the approved drawing and coating datasheet set the final figures.

Item Typical range or option Why it matters
Panel module 1,000 × 1,000 mm, 1,000 × 500 mm or project-specific modules Sets the bolt pattern, packing volume and the number of joints. Non-standard modules can increase tooling and lead time.
Steel thickness 2.5–5.0 mm, selected by tank height and load case The steel carries the water load. The coating does not add structural strength, so the panel calculation cannot be based on the coating.
Steel grade Structural mild steel to a stated standard, with mill certificate Grade, heat number and thickness must be traceable. Substitution without approval can fail a tender review.
Coating system Factory-fired glass enamel on both faces, with a stated firing process The supplier should name the coating system, the firing temperature range and the quality tests, not merely say “glass-coated”.
Coating thickness Project-specific, stated on the datasheet; measured on the finished panel Thickness affects barrier performance and chip resistance. A minimum thickness without a measurement method is not a specification.
Colour Standard factory colour, with other RAL colours by quantity Colour is part of the fired coating. A site-painted colour is not equivalent and can hide coating defects.
Joint sealing EPDM or project-approved seal strip, with gaskets at fittings The seal must match the water, temperature and cleaning chemicals. It is a wear item, not a permanent part of the tank.
Fasteners Stainless or project-approved coated bolts, washers and nuts Fastener corrosion can stain the coating and loosen joints. Specify the grade and the tightening procedure.
Tie rods / stays Internal or external system, sized to the load case Tie rods carry wall pressure. Their spacing and connection detail must be on the drawing.
Repair kit Approved glass repair compound, application instructions and colour match A chip repair must restore the barrier. A generic epoxy patch may not be compatible with the coating or the water.

Ask for the coating datasheet, the panel quality record and the repair procedure before you compare prices. Two GFS quotations can use the same panel size and the same steel thickness but different coating systems, different firing control and different inspection criteria. Those differences do not show on the cover sheet, but they determine how the tank performs after five or ten years.

Design life and water chemistry

GFS is often described as having a design life measured in decades. That statement is only meaningful when the water chemistry, temperature, coating system and handling regime are defined. A neutral or mildly alkaline water at ambient temperature is a much easier duty than an acidic effluent at 60 °C, and a coating that performs well in one is not automatically suitable for the other. The quotation should state the assumed water conditions and the expected coating life for those conditions, and the buyer should compare that figure with the project requirement.

The water analysis should include pH, chloride, sulphate, sulphide, alkalinity, hardness, dissolved oxygen, temperature, suspended solids, fats/oils/grease and any cleaning or disinfection chemicals. For wastewater, the headspace gas composition also matters: hydrogen sulphide and ammonia can attack the coating and the seal materials above the water line. For potable water, the local approval and the coating’s wetted-surface test report are part of the specification, not an afterthought.

Glass is resistant to many acids and alkalis, but it is not resistant to hydrofluoric acid, and it can be attacked by hot concentrated alkali. The exact limits depend on the coating system, concentration and temperature. Do not accept a generic “chemical resistant” statement. Give the supplier the actual analysis and cleaning chemicals, and require a written compatibility confirmation for the proposed coating. If the supplier cannot provide that confirmation, the material is not qualified for the duty.

Structural design, base and installation loads

GFS panels are structural panels. The wall thickness, tie-rod spacing, corner details and base support must be designed for the hydrostatic load, wind, snow and seismic action. The base must be flat, level and able to carry the full water load plus the tank, coating, accessories and any insulation. On a roof, the load transfers through a curb or frame; on a tower, the tower and tank are a single structural system.

The installation method must protect the coating. Panels should be lifted with the approved lifting points or slings, not dragged across the base. The base should be free of sharp objects, weld spatter and standing water. Panel edges should be protected during transport and storage. A small chip on the edge can expose the steel, and a repair that is not compatible with the coating can create a future failure point. The site crew should have the repair kit and the procedure before assembly starts, not after damage is found.

Wind and seismic design are project-specific. A tall tank in an open site has a different load case from a short tank inside a building. The quotation should state the design wind speed, seismic parameters and snow load, or list them as missing inputs. For elevated or buried installations, the structural interface must be reviewed by a qualified engineer, and the coating must be suitable for the backfill, groundwater and external exposure.

GFS compared with stainless, HDG and BDF

System Best fit Advantages Limitations
GFS bolted Municipal potable, wastewater, effluent, biogas-adjacent, large industrial volumes Factory-fired glass coating; good chemical resistance; long coating life; modular assembly; flat-packed export. Higher cost than HDG; coating can chip; repair needs the approved kit; not universal for every chemical.
Bolted stainless Potable, food, pharmaceutical-adjacent, coastal or chloride-sensitive duties No coating to repair; cleanable surface; good mechanical toughness; familiar to inspectors. Higher panel cost; chloride stress corrosion is possible in hot, concentrated conditions; welding and passivation must be controlled.
HDG bolted Fire, irrigation, stormwater, cooling make-up, general industrial water Lowest panel cost; robust zinc coating; flat packing; no site welding. Zinc surface is not universally accepted for potable water; limited resistance to strong acids, high chloride and some cleaning chemicals.
BDF duplex-coated Potable, fire, rural water and industrial duties where a barrier coating over galvanized steel is accepted Cost between HDG and GFS; robust substrate; barrier layer on the water side; flat packing. Depends on the specific coating system and approvals; field cuts need patching; lower chemical resistance than a qualified GFS system.
Welded stainless Seamless vessels, hygienic duty, tight sites, projects that prohibit bolted joints No gasket joints in the shell; smooth interior; suitable for CIP and high hygiene. Higher site skill and hot-work requirements; harder to transport; repair and modification are less modular.

The comparison should be made on installed cost over the service life, not on panel price. A GFS tank can be competitive at large volumes because the panel cost is lower than stainless and the coating life is long. It can be less competitive at small volumes, where stainless is simpler and the coating repair risk is easier to manage. The right choice depends on the water, the approval regime, the site and the maintenance capability of the owner.

Potable water and regulatory questions

Glass-coated steel is widely used for potable water, but “widely used” is not the same as “approved in your market”. Ask for the specific potable-contact approval, the test report and the scope of the certificate. The certificate should name the coating system, the factory and the product family. A certificate for a different coating or a different factory is not a substitute. If the local authority requires a lining, a specific colour or a sampling point, those requirements belong in the quotation.

For municipal projects, the buyer may also need a factory audit, a batch test record or a third-party witness at firing. These requirements affect the price and the lead time, so they should be stated at enquiry stage. Do not assume that a GFS panel is automatically accepted because it is “glass”. The approval is product- and factory-specific, and the project specification may add requirements that the standard product does not meet.

Packing, handling and repair

GFS panels are heavier and more fragile than HDG panels of the same size because of the coating and the firing process. They are packed with edge protection, interleaving and moisture protection, and the crates should be marked “coated panels — do not drag”. The container plan must account for panel weight and stacking limits. At site, store the panels on a clean, level surface, not on the ground, and keep them dry. Do not lift a panel by its coating or by a single edge.

Minor chips can be repaired with the approved compound after cleaning the exposed steel and preparing the edges. The repair procedure should state the surface preparation, the mixing ratio, the application method, the cure time and the acceptance criteria. A repair that is applied over a dirty or wet surface will fail. A large chip, a crack that reaches the steel or a damaged panel should be replaced rather than patched. Keep a repair kit and a small stock of spare panels for remote sites.

Do not paint the tank to “protect” the coating. A site-applied paint film can trap moisture, hide coating defects and void the coating warranty. If a colour change is required, ask the factory for a compatible coating colour or a approved system; do not treat the tank as a painted steel structure.

Site installation sequence

Stage What happens Hold point
1. Base acceptance Check level, dimensions, anchor positions, bearing capacity and freedom from sharp objects. Signed base acceptance before panels are unpacked.
2. Panel inspection Unpack, inspect coating, edges and bolt holes, and record any transit damage before assembly. Damage report and repair/replacement decision.
3. First ring Place base panels with the approved lifting method, fit seal strips and tighten in the specified sequence. Check diagonal dimensions and joint alignment.
4. Wall rings Add panels ring by ring, protecting the coating and keeping the tank square/round. Check verticality and tie-rod positions at each ring.
5. Tie rods / stays Install and tension the system to the drawing. Record torque or tension values.
6. Connections Fit inlet, outlet, drain, overflow, vent, level and ladder with correct gaskets. Check orientation, height and access.
7. Water-fill test Fill in stages, inspect joints and connections, and check for leakage and deformation. Test record with date, level and result.
8. Handover Clean, label valves, provide O&M, repair kit, spare parts and test records. Signed handover and maintenance schedule.

The installation crew should have the approved drawing, the panel schedule, the torque procedure, the coating repair procedure and the seal-strip instructions. A common error is to drag a panel across the base, which chips the coating on the underside. Another is to tighten one side of the tank before the opposite side, which pulls the panel grid out of alignment. A third is to leave a repair until after the water-fill test, when the leak path is already wet. Repair any chip before the tank is filled, and record the repair location.

Inspection and maintenance

Inspect the tank at handover and at least annually. Look at the coating for chips, cracks, rust staining, discolouration and blistering; at the joints for seal compression, cracking or displacement; at the bolts for corrosion or loosening; and at the base for settlement or cracking. For wastewater, inspect the headspace and the area above the water line, where gas-phase corrosion can be more severe than in the water. For potable water, follow the project’s sampling and cleaning schedule.

Keep a repair log. A chip that is repaired early is a minor maintenance item; a chip that is left until the steel rusts through becomes a panel replacement. The repair log should record the date, location, size, surface preparation, material and cure. If the same area requires repeated repairs, the cause may be a handling problem, a structural movement or a coating defect, and the panel should be reviewed rather than patched again.

Seal strips are a wear item. Replace them when they are cracked, permanently deformed, chemically swollen or leaking. Keep a spare set, especially for remote sites. When a panel is replaced, inspect the adjacent panels and joints; a repair that restores one panel but leaves a distorted joint can create a new leak path.

What to include in a GFS tank RFQ

  • Capacity or dimensions, and whether the volume is nominal, effective or fire usable volume.
  • Application and water source: potable, wastewater, effluent, biogas, fire, irrigation or industrial process.
  • Water analysis: pH, chloride, sulphate, sulphide, alkalinity, hardness, dissolved oxygen, temperature, suspended solids and cleaning chemicals.
  • Site location, indoor/outdoor, coastal or industrial exposure, wind/snow/seismic parameters and base type.
  • Connection sizes and positions, inlet/outlet/drain/overflow/vent, level control and ladder access.
  • Destination port, Incoterm, container constraints, site access and lifting equipment.
  • Potable-contact approval, fire code, inspection requirement, documentation pack and any third-party witness point.
  • Required coating colour, repair kit and spare panel allowance.

Quality and documentation

The inspection plan should be agreed before production. For a standard GFS tank, the usual records are: steel mill certificate; panel dimensional inspection; coating thickness and coating appearance record; firing process record; holiday or spark test where specified; adhesion or impact test where specified; bolt and seal material certificates; trial assembly where specified; water-fill test record; packing inspection and loading photos; and the installation manual with torque values, repair procedure and maintenance schedule. Third-party inspection is added when the purchase order requires it.

Certification is different from inspection. A test record proves what was checked on this order. A certificate proves that a product, factory or process has been assessed by a recognised body. Do not accept a certificate number that does not name the product and the factory, and do not accept a “potable” claim without the document that supports it for the destination market. Where a required certificate is not held for the proposed tank, the quotation should say so before award.

Frequently asked questions

What does “glass-fused-to-steel” mean?

Steel panels are coated with a glass enamel slurry and fired so that the glass fuses to the steel surface. The finished coating is a hard, inert layer on both faces. It is not a paint film and it is not a thick chemical-process glass lining; it is a thin factory-fired coating on a structural panel. The steel carries the load and the coating protects the surface.

Is GFS suitable for drinking water?

Glass-coated steel is widely used for potable storage, but suitability depends on the specific coating system and the local approval. Ask for the potable-contact certificate or test report that names the coating, the factory and the product family. If the certificate does not cover the proposed tank, the quotation should state that before award. A generic “food grade” statement is not sufficient for a tender.

How long does a GFS tank last?

The design life depends on the coating system, water chemistry, temperature, handling and maintenance. It is often measured in decades for normal water duties, but that is not a guarantee for every duty. The project-specific figure should be stated in the quotation for the actual water analysis and operating conditions. Compare that figure with the required design life, and include the repair and inspection plan in the comparison.

What colours are available?

GFS panels are supplied in a standard factory colour, with other RAL colours available by quantity. The colour is part of the fired coating, not a site-applied paint. Confirm the colour, gloss and batch match at order stage. If a project requires a specific colour for architectural or safety reasons, state it in the enquiry so that the factory can confirm availability and lead time.

Can GFS tanks go underground or on towers?

Yes, buried and elevated designs can be supplied with the corresponding structural package. For buried tanks, the external coating, backfill, groundwater and inspection access must be reviewed. For towers, the tower and tank must be designed together, and the tank base must match the tower support points. Send the site conditions, loads and access constraints with the enquiry.

What spare parts should we stock?

At minimum, a repair kit, a set of seal strips and a small number of bolts and gaskets. For remote sites, add one spare panel of the most exposed size if the budget allows. The handover pack should list the recommended spares for the tank size and the repair procedure. A missing seal strip can stop a repair; a spare set is a small cost compared with a shutdown.

Can GFS panels be repaired on site?

Minor chips can be repaired with the approved compound after cleaning and preparing the exposed steel. The repair procedure should state the surface preparation, mixing ratio, application method, cure time and acceptance criteria. A large chip, a crack that reaches the steel or a damaged panel should be replaced. Do not use a generic paint or epoxy patch without the coating supplier’s approval.

Is GFS the same as a glass-lined pressure vessel?

No. A glass-lined pressure vessel has a thick glass lining designed for chemical process duty under pressure. A GFS water tank uses a thin factory-fired glass coating on a structural steel panel, assembled with bolts and seals at atmospheric pressure. The two products share the word “glass” but have different construction, testing and design limits. Do not use a GFS tank as a pressure vessel.

How does GFS compare with stainless steel?

Stainless is simpler to inspect and repair, has no coating to chip, and is well understood for hygienic duty. GFS is usually lower cost at large volumes and can offer good chemical resistance for wastewater and effluent. The right choice depends on the water chemistry, the approval regime, the budget and the maintenance capability. For small, highly hygienic potable duties, stainless often wins; for large municipal or wastewater volumes, GFS is often more economical.

What water chemistry is unsuitable for GFS?

Hydrofluoric acid, hot concentrated alkali and some strongly oxidising or solvent-containing streams can attack the coating. The exact limits depend on the coating system, concentration and temperature. Give the supplier the full analysis and cleaning chemicals, and require a written compatibility confirmation for the proposed coating. If the chemistry is outside the supplier’s range, do not select GFS on the basis of a generic “chemical resistant” claim.

How are GFS panels packed for export?

Panels are packed with edge protection, interleaving and moisture protection in steel-framed crates or on pallets. The crates are marked to prevent dragging and to identify the panel sequence. The container plan accounts for panel weight, stacking limits and unloading order. At site, store the panels on a clean, level surface, keep them dry and lift them with the approved method. Inspect for transit damage before assembly.

What documents are supplied?

The standard pack includes the approved general arrangement drawing, panel schedule and erection sequence, steel and coating records, test records, bolt and seal certificates, water-fill test record, packing list, installation manual, repair procedure and warranty document. Third-party inspection records are added when the purchase order requires them. Certificates are supplied only where a valid certificate covers the proposed product and factory.

Capacities, panel sizes, material grades, coating thickness, test scope, packing and lead times are confirmed in writing for each project before quoting. This page describes the GFS system; it does not certify a particular tank or approve it for a particular water. The approved drawing and the project specification govern.

Buyer terminology: what this product is called in different markets

The same product is searched under different English names in different regions. The table below records the names buyers actually use, so a specification or RFQ is not lost to a literal translation.

Primary English name: Glass-fused-to-steel (GFS) sectional water tank
Also searched as: glass fused to steel tank · GFS tank · glass-coated steel tank · vitreous enamel steel tank · glass-lined steel tank · GFS bolted tank.

MarketCommon English search name
United States & Canadaglass-fused-to-steel bolted tank; glass coated steel tank
United Kingdom & Europeglass-fused-to-steel sectional tank; vitreous enamel steel tank
Middle East & GCCGFS sectional water tank; glass fused steel panel tank
Southeast Asiaglass fused to steel bolted tank; GFS tank
India & South Asiaglass fused to steel tank; GFS panel tank
AfricaGFS steel tank; glass coated steel water tank
Australia & New Zealandglass fused to steel tank; GFS modular tank

Attribute and application terms: factory-fused glass coating, corrosion-resistant, UV-stable, abrasion-resistant, long service life, bolted modular construction. Typical duties include municipal wastewater, anaerobic digestion and biogas, industrial effluent, potable water, fire water, brine and slurry storage.

Long-tail search phrases

  • glass fused to steel bolted tank for wastewater treatment.
  • GFS tank for anaerobic digestion and biogas plants.
  • vitreous enamel steel tank for industrial effluent.
  • glass coated steel tank for potable water storage.
  • GFS sectional tank for brine and slurry duty.

“GFS” is industry shorthand and should be spelled out on first use. “Glass-lined” can describe a different lining, so use it only as a secondary search synonym, not as the technical name.

Related products and systems

Glass-fused-to-steel sectional water tank with cream glass-coated panels, bolted modular construction

Glass-Fused-to-Steel (GFS) Sectional Water Tank

Glass-fused-to-steel (GFS) sectional water tank: factory-fused glass coating on bolted panels for municipal, wastewater, biogas and industrial storage.

Steel sheet with factory-fired glass (glass-fused-to-steel)
BDF composite panel water tank with bolted panels and access ladder

Duplex-Coated Galvanized Steel Panel Water Tank (BDF)

Duplex-coated galvanized steel panel water tank (BDF) for potable, fire and rural water: modular, flat-packed and available with a project-approved coating.

Hot-dip galvanized steel with bonded protective coating (duplex)
Welded stainless steel water tank with embossed panels and access ladder

Welded Stainless Steel Water Tank (304 / 316)

Welded stainless steel water tank (SS304/316L) for potable, food, pharmaceutical and process duty, with factory or site welding and export documentation.

SS304 / SS316 / SS316L stainless steel, welded construction
Aseptic stainless steel water tank with filtered vent and CIP connections in a purified water plant

Aseptic Stainless Water Tank (SS304 / SS316L)

Aseptic stainless steel water tank (sterile/pharmaceutical purified water tank) in SS316L with 0.22 micron vent, CIP/SIP and nitrogen option.

SS304 / SS316L hygienic stainless steel
Stainless steel bag filter housings for 1 to 100 micron water polishing

Bag Filter for Water Treatment (1-100 micron)

Liquid bag filter housing for water treatment: single and multi-bag units in carbon steel, SS304/316L or PP for RO guard and process…

Carbon steel, SS304/316L, PP; NBR/EPDM/FKM/silicone seals

Frequently asked questions

What does glass-fused-to-steel mean?

Steel panels are coated with a glass enamel slurry and fired so the glass fuses to the steel surface. The finished coating is a hard, inert layer on both faces. It is not a paint film and not a thick chemical-process glass lining; the steel carries the load and the thin factory-fired coating protects the surface.

Is GFS suitable for drinking water?

Glass-coated steel is widely used for potable storage, but suitability depends on the specific coating system and local approval. Ask for the potable-contact certificate or test report that names the coating, factory and product family. If it does not cover the proposed tank, the quotation should state that before award. A generic food-grade statement is not sufficient for a tender.

How long does a GFS tank last?

Design life depends on the coating system, water chemistry, temperature, handling and maintenance. It is often measured in decades for normal water duties, but that is not a guarantee for every duty. The project-specific figure should be stated for the actual water analysis and operating conditions, and compared with the required design life.

What colours are available?

GFS panels are supplied in a standard factory colour, with other RAL colours available by quantity. The colour is part of the fired coating, not a site-applied paint. Confirm colour, gloss and batch match at order stage. If a project requires a specific colour for architectural or safety reasons, state it in the enquiry so the factory can confirm availability and lead time.

Can GFS tanks go underground or on towers?

Yes, buried and elevated designs can be supplied with the corresponding structural package. For buried tanks, the external coating, backfill, groundwater and inspection access must be reviewed. For towers, the tower and tank must be designed together, and the tank base must match the tower support points. Send site conditions, loads and access constraints with the enquiry.

What spare parts should we stock?

At minimum, a repair kit, a set of seal strips and a small number of bolts and gaskets. For remote sites, add one spare panel of the most exposed size if the budget allows. The handover pack should list recommended spares for the tank size and the repair procedure. A missing seal strip can stop a repair; a spare set is a small cost compared with a shutdown.

Can GFS panels be repaired on site?

Minor chips can be repaired with the approved compound after cleaning and preparing the exposed steel. The procedure should state surface preparation, mixing ratio, application method, cure time and acceptance criteria. A large chip, a crack that reaches the steel or a damaged panel should be replaced. Do not use a generic paint or epoxy patch without the coating supplier's approval.

Is GFS the same as a glass-lined pressure vessel?

No. A glass-lined pressure vessel has a thick glass lining designed for chemical process duty under pressure. A GFS water tank uses a thin factory-fired glass coating on a structural steel panel, assembled with bolts and seals at atmospheric pressure. The two products share the word glass but have different construction, testing and design limits.

How does GFS compare with stainless steel?

Stainless is simpler to inspect and repair, has no coating to chip, and is well understood for hygienic duty. GFS is usually lower cost at large volumes and can offer good chemical resistance for wastewater and effluent. The right choice depends on water chemistry, approval regime, budget and maintenance capability.

What water chemistry is unsuitable for GFS?

Hydrofluoric acid, hot concentrated alkali and some strongly oxidising or solvent-containing streams can attack the coating. Exact limits depend on the coating system, concentration and temperature. Give the supplier the full analysis and cleaning chemicals, and require a written compatibility confirmation for the proposed coating. If the chemistry is outside the supplier's range, do not select GFS on a generic chemical-resistant claim.

How are GFS panels packed for export?

Panels are packed with edge protection, interleaving and moisture protection in steel-framed crates or on pallets. The crates are marked to prevent dragging and to identify the panel sequence. The container plan accounts for panel weight, stacking limits and unloading order. At site, store panels on a clean, level surface, keep them dry and lift them with the approved method.

What documents are supplied?

The standard pack includes the approved general arrangement drawing, panel schedule and erection sequence, steel and coating records, test records, bolt and seal certificates, water-fill test record, packing list, installation manual, repair procedure and warranty document. Third-party inspection records are added when required. Certificates are supplied only where a valid certificate covers the proposed product and factory.

Need a product specification for your project?

Send your capacity, flow, water quality, material and site requirements — quotation response within 12 working hours.

Request a Quotation