Tank Standards and Certification Matrix

A standard is a design basis; a certificate is a document issued for a specific product, factory and scope. They are not the same thing. This page separates the standards a tank can be designed against from the certificates a supplier may or may not hold, so that a tender review can ask the right question.

Use the matrix below to identify the common reference standards for each tank family and the documents normally issued. Before award, ask for the exact certificate number, product model, factory and validity date for any certification claimed.

Standards matrix

Standard / scheme Typical application What it covers LONGCOM position
AWWA D103 Bolted steel water storage Design, materials, erection and inspection of bolted steel tanks. Can be used as a design basis where the project specifies it. Project-specific compliance to be confirmed in the quotation.
AWWA D100 Welded steel water storage Design, fabrication and inspection of welded steel tanks. Can be used as a design basis for welded tank projects. Structural calculations and inspection scope to be agreed.
NFPA 22 Fire protection water tanks Fire-reserve arrangement, fittings, access and inspection. Design inputs can follow NFPA 22 where specified. AHJ approval remains a project responsibility.
EN 12845 Automatic sprinkler systems / fire reserve Fire-pump and water-supply requirements, including tank arrangement. Can be used as a design reference. Local fire authority acceptance to be confirmed.
ISO 28765 Glass-fused-to-steel tanks Design and application of GFS tanks for water and wastewater. Applicable to GFS design where specified. Coating records and repair procedure can be provided.
NSF/ANSI 61 Drinking-water system components Health effects of wetted materials and products. Material certificates can be provided. NSF/ANSI 61 certification is not claimed unless a valid certificate is issued for the proposed product and factory.
WRAS UK drinking-water products Material and product approval for potable water. Not claimed unless a valid WRAS approval covers the proposed product. Confirm before specifying.
FM / UL Fire-protection equipment and tanks Listed or approved fire-protection products. Not claimed unless a current listing or approval is issued for the proposed product. AHJ acceptance to be confirmed.
API 12B Bolted production tanks (oilfield) Shop-fabricated bolted tanks for production service. Can be reviewed as a design reference for bolted tanks. Not a default for water storage.
Local building / seismic code All tank types Structural loads, anchorage and base design. Loads and anchorage details can be provided. Foundation and building design remain with the project engineer.

How to read the matrix

“Can be used as a design basis” means the project can specify the standard and we will design and document the tank against it. It does not mean a third-party certificate is held. “Documentation can be provided” means material certificates, dimensional records, test records or O&M instructions can be issued for the project. “Not claimed” means exactly that: we will not put a logo or a certificate number on a submittal unless the document exists and covers the scope.

This approach is deliberate. A buyer who discovers a missing certificate after the tank has shipped has a much bigger problem than a buyer who is told at quotation stage. If a tender requires a specific listing, send the exact requirement and the country of installation; we will confirm whether it can be met before price negotiation.

Documents normally issued with a tank

Document When issued What it proves
General arrangement drawing For approval before fabrication Geometry, connections, access, base interface.
Material certificate With fabrication or on delivery Grade and heat number of the plate or coil.
Dimensional inspection record Before packing Panel size, hole pattern and flatness.
Weld map / NDT report For welded tanks, when specified Weld location and inspection result.
Coating record For coated tanks Surface preparation, thickness and repair.
Water-fill test record After site assembly or factory test Leak-tightness of the assembled tank.
Installation manual / O&M With delivery Assembly, torque, commissioning and maintenance.
Warranty document With contract or delivery Scope, period and exclusions.

Certification questions to ask every supplier

  • What is the exact certificate number, and which product model does it cover?
  • Which factory is covered? Is it the same factory that will make my tank?
  • What is the validity date, and is the certificate current?
  • Does the certificate cover the wetted materials, coatings, seals and fittings actually proposed?
  • Is the certificate issued by an accredited body, and can it be verified independently?
  • If the certificate does not cover my scope, what alternative document can be provided?

Standards are not a substitute for a design review

A tank can be “designed to” a standard and still be wrong for the site. The standard does not know the actual wind load, the base condition, the water chemistry or the access route. The design review must connect the standard to the project. That is why the engineering review starts with the design basis, not with a product code.

Need a project-specific statement?

Send the standard, country, application and required certificate. We will return a written position: what can be designed, what can be documented, what is held and what is not. If a required certificate is not held, we will say so before award.

Ask for a standards and documentation review

Need a product specification for your project?

Send your capacity, flow, water quality, material and site requirements — quotation response within 12 working hours.

Request a Quotation