This section is the buyer’s library for LONGCOM water tank projects. It is written for the people who have to approve, ship, install and hand over a tank — not for search engines alone.
Start here
- Technical downloads — specification sheets, selection matrix, packing checklist and RFQ checklist in PDF.
- Export logistics for water tanks — the six stages from RFQ to site handover, plus the documents and decisions at each stage.
- Engineering and project support — design basis, selection, drawings, structural interface and inspection plan.
- Container loading — 20GP, 40HQ, flat-rack and break-bulk; panel weight and securing.
- Export packing — crates, marks, seals, fasteners and potable-duty protection.
- Site installation — base acceptance, assembly, torque, water-fill test and handover.
- Export documentation — invoice, packing list, B/L, CO, material and test records.
- Incoterms and lead time — FOB Nansha, CIF destination and schedule planning.
Related project resources
For application selection, start with solutions by application. For product data, start with the product index. For quality documents and the certification policy, see Standards and Certification Matrix. For project references and application notes, see Project References.
If your question is not answered here, send the project data through the RFQ page. We will confirm the missing information and the next step in writing.
