Project references are useful only when the application, the scope and the limits are clear. The pages below use public project records and confirmed company data. Where the capacity, completion date or client approval is not confirmed, the page says so rather than filling the gap with a number.
Featured project references
| Project | Application | Confirmed scope | Read |
|---|---|---|---|
| Prologis Dongguan Shipai Logistics Park | Fire water reserve | Completed June 2015; 12 m × 12 m × 6 m; nominal 864 m³; factory panel system assembled on site. | Project page |
| Foshan Taihe Hongjun Mansion | Residential fire reserve | Roof load review, non-standard dimensions, pressure test and acceptance. | Project page |
| Shenzhen Gold Exchange | Financial building fire reserve | Roof load review, non-standard dimensions, pressure test and acceptance. | Project page |
| Guangzhou Changlong Group | Hospitality domestic water | Stainless steel domestic water tank. | Project page |
Other project references
The company project record also lists stainless water tank work for residential, commercial, institutional and industrial sites, including Foshan Taihe Hongjun Mansion, Shenzhen Gold Exchange, the tobacco logistics park, Guangzhou Changlong Group, Shanwei Xinghewan Hotel, Shenzhen China Construction Steel Structure Building, Foshan Zhiyue Youcheng Plaza, Panyu IKEA, Shenzhen Nankai Building, Qianhai Innovation Business Center, Huizhou Lihe 3 × 3 × 3 tank and Pingshan Mobile Training Brigade. These names are listed as references only. Capacity, date, photos and client approval are not published unless they have been confirmed for a specific project page.
Why we do not publish anonymous “case studies”
An anonymous case study with invented capacity, invented savings and a stock photo is easy to write and useless to a consultant. A reviewer needs to know the application, the design basis, the actual constraints and what was supplied. If that information cannot be verified, the honest option is a reference profile with the confirmed scope and a clear note on what is not disclosed.
For a live tender, we can provide a project-specific reference letter, a redacted drawing or a client contact where the client has agreed. Those are handled through the sales team, not published on the website.
Have a similar project?
Send the application, capacity, site constraints, water analysis and required standard. We will identify the closest reference and confirm what can be shared. If the project is under an NDA, we will not publish the name, capacity or photos without written approval.
