Prologis Dongguan Fire Water Tank

A 12 m × 12 m × 6 m fire water tank for a logistics park is a logistics project as much as a tank project. The Prologis Dongguan Shipai Logistics Park installation was completed in June 2015 with a nominal geometric volume of 864 m³, built from factory panels and assembled on site. The project is a reference for large-footprint fire reserves where the container plan, base preparation and installation sequence have to be fixed before the panels arrive.

Project profile

Item Project information
Project Prologis Dongguan Shipai Logistics Park fire water tank
Location Dongguan, Guangdong, China
Application Fire protection water reserve
Completion June 2015
Tank footprint 12 m × 12 m
Tank height 6 m
Nominal geometric volume 864 m³
Construction Factory-built panel system, assembled on site

The volume above is nominal geometric volume. The usable fire volume is lower once freeboard, dead volume, outlet clearance and vortex allowance are deducted. The fire design should state the usable volume, not only the tank’s external dimensions.

The challenge

A logistics park fire reserve has three characteristics that make it different from a building-services tank. First, the tank is large enough that the panel count and container plan drive the delivery schedule. Second, the site is usually shared with warehouses, yards and traffic, so the assembly area and lifting plan must fit around operations. Third, the fire reserve has to be ready for inspection and testing before the park is handed over, which means the base, connections and access cannot be left to the end of the build.

The tank also has to sit on a base that can carry the filled weight without differential settlement. A 6 m water height imposes a significant load on the base and the panel joints. The base must be level and continuous, and the anchorage must be arranged before the first panel is placed. On a fast-track logistics project, the tank package has to be coordinated with the civil, structural and fire-protection trades rather than treated as a late procurement item.

The solution

The tank was supplied as a modular panel system: factory-punched panels, sealing strips, bolts and structural components packed by erection sequence. The 12 m × 12 m footprint gives a square plan that is efficient for panel layout but requires a clear assembly sequence around the perimeter. The 6 m height means the upper panels and roof cannot be handled without a planned lifting method and a stable working platform.

The site work followed a simple hold-point sequence: base acceptance, panel delivery and storage, bottom and wall erection, joint torque, roof and access installation, connection check, water-fill test and inspection. Packing by zone reduced site sorting. The panel marking, packing list and erection drawing had to agree; a missing crate or a mis-marked panel can stop a large tank more effectively than a late delivery.

Why a bolted panel system

For a large fire reserve, a bolted stainless panel system offers three practical advantages. The panels are factory-formed and punched, so the site work is assembly rather than cutting and welding. The kit can be packed into containers and shipped in a defined sequence. Damaged or future replacement panels can be handled without dismantling the whole tank.

The alternative is a welded tank. A welded tank can be appropriate for a high-head or irregular shape, but it may require site welding, more lifting and a larger site footprint. For a logistics park with a fixed handover date, the panel system reduces the site labour and the weather risk. The choice should still be confirmed against the fire code, the water chemistry and the owner’s maintenance strategy.

What the project demonstrates

  • Large-footprint fire reserve: a 12 m × 12 m plan can be delivered as a panel kit without site fabrication.
  • Height and base interface: a 6 m tank requires a designed base and a lifting sequence, not only a panel quotation.
  • Sequence matters: packing by erection zone and a marked panel schedule reduce site delays.
  • Usable volume: the fire design should deduct freeboard and outlet allowances from the nominal 864 m³.
  • Inspection access: roof access, vent, drain and connections should be installed as part of the tank scope, not added later.

Lessons for a similar project

Start with the fire design basis, not the tank dimensions. Confirm the fire flow, duration, make-up rate and usable volume before comparing tank sizes. Then confirm the base, the anchorage and the lifting plan. A tank that is correct on paper can fail at site if the base is not level or the largest panel cannot be moved into position.

For an export project, add the container plan to the design review. A 12 m × 12 m × 6 m tank is not a single packaged unit; it is a kit with a sequence. The packing list, crate marking and installation manual are part of the product. If the site team cannot follow the sequence, the tank will take longer to assemble and the risk of damage increases.

Related pages

For the application design inputs, read fire protection water tanks. For the panel product data, see the bolted stainless tank. For site planning, use the container loading guide and the installation guide.

Send your fire tank dimensions and design basis

Need a product specification for your project?

Send your capacity, flow, water quality, material and site requirements — quotation response within 12 working hours.

Request a Quotation