Use these documents to screen a tank, prepare a tender or brief a site team. The PDFs below are generic technical sheets, not project-specific submittals. For a project quotation, send the enquiry data so that the drawing, material grade, connections and certification scope can be confirmed.
Download technical documents
| Document | What it covers | Download |
|---|---|---|
| Bolted stainless water tank specification | Panel sizes, thickness range, SS304/SS316 options, roof and connections, quality records. | |
| Welded stainless water tank specification | Welded shell, SS304/316/316L, surface finish, inspection and documentation. | |
| Water tank selection matrix | Fire, potable, wastewater, process, irrigation and HVAC; system comparison and inputs. | |
| Export packing and container checklist | Crate marking, protection, loading, securing and site receipt checks. | |
| Tank RFQ checklist | The project, water, site and documentation data needed for a useful quotation. |
How to use these documents
For a consultant: use the selection matrix to shortlist a tank system, then use the RFQ checklist to collect the design inputs. The specification sheets give the data normally needed for a preliminary submittal.
For a contractor: use the packing checklist before the container is sealed and again on site receipt. A missing seal or fastener box can stop an installation more effectively than a late panel.
For a buyer: use the RFQ checklist to separate what is known from what must be confirmed. A quotation without a design basis is only a price.
What is not in these PDFs
These documents do not contain project-specific drawings, structural calculations, foundation design, a certificate for a particular product or a compliance statement for a particular country. Those documents are issued against a defined scope after the design basis is agreed.
If a tender requires a named certificate, listing or approval, send the exact requirement and the country of installation. We will confirm whether a valid document covers the proposed product and factory before award. We do not put a certificate logo on a submittal unless the document exists for that scope.
Need a project-specific submittal?
Send the application, volume, water analysis, site location, connection schedule and named standard. We can prepare a project submittal package with the general arrangement, product data, material specification, test plan and installation requirements. If a drawing is not available, the RFQ checklist shows what is needed to start it.