A tank is not maintained by the supplier after delivery unless the contract says so. That is why the service scope should be written down before the tank is ordered. LONGCOM can support inspection, repair, refurbishment, spare parts and operator training for the stainless, HDG, GFS and BDF tanks we supply. The scope can be remote, on-site or a combination, depending on the location and the condition of the tank.
This page explains what can be inspected, what can be repaired, what spares should be kept and what information is needed before a service visit can be quoted. It is written for facility managers, water utilities, plant engineers and contractors responsible for an installed tank. For the detailed inspection and repair procedure, see inspection, repair and maintenance.
When to inspect a tank
- Annual or project-specified inspection, including the roof, access, vent and overflow.
- Leak at a panel joint, roof penetration or connection.
- Corrosion, coating damage, seal degradation or fastener loosening.
- Water-quality complaint, taste, odour, algae or sediment.
- Structural concern after wind, seismic, flood or impact.
- Change of duty, temperature, chemical or disinfection regime.
- Before a refurbishment, expansion or relocation.
Service scope
| Service | What it includes | Typical output |
|---|---|---|
| Desktop review | Drawings, photos, operating history and water analysis reviewed before a site visit. | Preliminary cause list and visit plan. |
| Site inspection | Visual check of panels, joints, roof, access, connections, base and anchorage; leak mapping; coating or weld assessment. | Inspection report with photos and prioritised actions. |
| Leak repair | Joint re-torque, seal replacement, local panel repair, connection re-sealing. | Repair record and retest. |
| Coating repair | Surface preparation, touch-up, patch repair, repair procedure review. | Coating repair record and future maintenance plan. |
| Panel replacement | Removal and replacement of damaged panels, with adjacent joint inspection. | Replacement record and water-fill test. |
| Cleaning and disinfection | Drain, clean, disinfect, flush and sample for potable or process duty. | Cleaning record and sample results (by project). |
| Spare parts | Panels, seals, bolts, washers, roof components, access covers, touch-up material. | Packing list and installation notes. |
| Operator training | Inspection routine, torque check, leak response, cleaning procedure, record keeping. | Training record and maintenance checklist. |
What causes most tank problems
The majority of service issues are not caused by the tank material. They come from the base, the connection detail, the installation sequence or the operating regime. A base that is not level can distort panels and open joints. A pipe that is forced into a connection can load the panel. A tank that is kept full and stagnant can corrode or develop water-quality problems. A tank that is cleaned with an aggressive chemical can damage a coating or a seal.
The inspection should therefore look at the tank in its system: base, anchorage, pipework, valves, vent, overflow, level controls and the operating log. Replacing a seal without fixing the movement that opened the joint will only postpone the next leak.
Spare parts strategy
Keep a small spare kit for every tank: sealing strip, bolts and washers, a few panel clips, touch-up material and the installation manual. For remote sites, increase the kit to cover the most likely damage and include a torque wrench and the correct bit. For potable tanks, keep the spare seals in a clean, dry container and record the batch.
Spare panels should be ordered with the original panel marking and thickness. A panel from a different production batch may fit, but the hole pattern, coating and flatness should be checked before installation. For coated tanks, the repair procedure and the matching touch-up material are part of the spare kit.
Inspection report and follow-up
A useful inspection report is not a photo dump. It should identify the observation, the likely cause, the consequence, the recommended action and the priority. It should distinguish between “monitor”, “repair at next outage” and “repair now”. It should also state what was not inspected and why, so that the report is not read as a clean bill of health for the whole tank.
After a repair, the tank should be retested and the record added to the asset file. If the repair involves a potable tank, the cleaning and disinfection record should be updated and the water sampled before return to service.
What to send before requesting service
- Tank type, size, year of installation and original drawing or serial number.
- Photos of the whole tank, the affected area and the base/connections.
- Description of the problem, when it started and what changed.
- Water analysis and operating temperature/chemicals.
- Site access, lifting equipment and confined-space arrangements.
- Required response time and any shutdown window.
Service boundaries
Structural repair of a building, foundation work, electrical and control integration, process treatment and local permits are normally outside the tank service scope. They can be included by a separate agreement. A service visit should not be treated as a certification of the tank for a new duty; a change of duty needs a design review.