Bolted sectional tanks ship flat, install fast and extend easily; welded tanks give a seam-free,
permanent vessel. The right choice depends on five project variables — this guide walks through each one
the way our engineers score an enquiry.
1. Freight and site access
Bolted panels pack flat into containers — a full tank ships in a fraction of the volume of a fabricated vessel.
Remote sites with limited cranage favor bolted.
2. Installation speed and hot-work restrictions
Bolted assembly needs hand tools and modest lifting; no welding permits, no fire watch. Occupied industrial
sites and city projects usually mandate bolted.
3. Hygiene and maintenance
Welded stainless has no joint seals at all — nothing to inspect or replace. Bolted tanks need periodic seal
inspection. High-spec potable and pharma duties often specify welded for this reason.
4. Future extension or relocation
Only bolted tanks extend panel-by-panel or move to a new foundation.
5. Budget shape
Bolted typically wins on installed cost for standard rectangular duties; welded wins where special shapes or
very high heads would otherwise need heavy modular reinforcement. Get both priced — LONGCOM manufactures both and
will quote them side by side.
Capacities, panel sizes, material grades and lead times are confirmed in writing for each project before quoting.
