Most tank problems are decided before the first panel is cut: the wrong design basis, an unresolved base detail, a nozzle that cannot be reached, or a specification that nobody has checked against the actual site. LONGCOM’s engineering support is built around those decisions. We review the enquiry, confirm the design inputs, issue a drawing for approval and keep the fabrication and inspection scope aligned with what the project actually needs.

This page sets out what we can do before, during and after fabrication. It is written for consultants, EPC contractors, project managers and buyers who need to know which documents and decisions belong to the tank supplier and which remain with the project.

1. Enquiry review and design basis

We start by turning the enquiry into a design basis: application, volume, flow, water chemistry, temperature, pressure or head, site loads, access and the applicable standard. If a document is missing, we say so. A quotation issued without a design basis is a price, not a specification.

Review item What we check Output
Application and duty Fire, potable, wastewater, process, irrigation or HVAC; continuous or intermittent. Design basis note.
Volume and hydraulics Nominal vs usable volume, fill/draw rate, outlet, overflow, vent, freeboard. Tank sizing and connection schedule.
Water and chemistry Chloride, pH, temperature, disinfectant, cleaning chemicals, solids. Material and coating recommendation.
Site and structure Base, wind, snow, seismic, roof load, access, lifting. Load data and base interface drawing.
Code and certification Named standard, AHJ requirement, certificate or listing. Compliance and document scope, with gaps stated.

2. Selection and optimisation

We compare bolted stainless, welded stainless, HDG, GFS and BDF against the duty, not against a preferred product. The comparison includes installed cost, shipping volume, site labour, corrosion allowance, service life and maintenance access. If a different system is a better fit, we will say so.

For large tanks, the geometry optimisation matters. A taller tank may reduce the footprint but increase panel thickness and base load. A wider tank may reduce height but increase the roof and panel count. We test the options against the container plan and the site access before the drawing is frozen.

3. Drawings and submittals

The drawing set typically includes a general arrangement, plan and sections, panel layout, roof and access arrangement, connection schedule, foundation interface, anchorage details and a bill of materials. The drawing is issued for review and comment before fabrication. Nozzle orientation, flange standard, access direction and lifting points should be confirmed at this stage.

For projects that require a submittal package, we can prepare a coordinated PDF with the drawing, product data, material specification, test plan and installation requirements. The package is written for the reviewer, not for the factory: it should show the design basis, the interface and the hold points.

4. Structural and foundation interface

We provide the tank loads, the base layout and the anchorage requirements. The foundation design is normally by the project’s structural engineer, who knows the soil, the water table and the local code. We review the interface drawing for level tolerance, flatness, edge distance and anchor placement. A tank that is structurally adequate but sits on a base that is not flat will leak or distort.

For roof-mounted or elevated tanks, the review includes wind uplift, seismic restraint, roof load distribution and access for panels. If the roof cannot take the load, a transfer structure or a different location is needed. That decision should be made before the tank is ordered.

5. Fabrication and inspection plan

The inspection plan is agreed at the quotation stage. It can include material certificate review, dimensional inspection, panel flatness, weld inspection, coating thickness, leak test and water-fill test. Hold points and witness requirements are stated in the plan. If a third-party inspector is involved, the inspector’s access and document requirements should be agreed before production.

Stage Typical check Record
Incoming material Grade, thickness, certificate, surface condition. Material certificate and receiving record.
Panel fabrication Dimensions, hole pattern, flatness, edge condition. Dimensional inspection record.
Welding (where applicable) Procedure, welder qualification, visual inspection, NDT if specified. Weld map and inspection report.
Coating (where applicable) Surface preparation, thickness, adhesion, repair. Coating record.
Assembly / leak test Fit-up, torque, water fill, leak observation. Water-fill test record.

6. Site support and commissioning

Site support can be remote or on-site. Remote support includes drawing clarification, installation sequence review, torque and test procedure, and response to site queries. On-site support can include base acceptance, assembly supervision, torque verification, water-fill test witness and punch-list close-out. The scope, duration and cost should be agreed before mobilisation.

Commissioning is not complete when the tank holds water. The inlet, outlet, overflow, vent, drain, level controls and access must be checked against the drawing; the tank must be clean and ready for the process; and the O&M instructions must be handed over to the operator.

What is not included by default

Foundation design and construction, structural calculations for the building or roof, fire-pump selection, process design, electrical and controls integration, local permits and AHJ approval are normally outside the tank scope. They can be included by a separate agreement, but they should never be assumed. A clear scope boundary protects both sides.

What to send for an engineering review

  • Application and duty, with a short process description.
  • Required volume and flow rates; fire duration if applicable.
  • Water or effluent analysis, temperature and cleaning chemicals.
  • Site location, base or roof arrangement, wind/seismic/snow loads.
  • P&ID or connection schedule, if available.
  • Named standard, certificate, listing or AHJ requirement.
  • Required delivery date and site access constraints.